Peterborough City Council prints its building regulations charges in full. Its neighbours to the east and north-east, Fenland and South Holland, only price a job when you ask. This study sets out what Peterborough publishes, which line is likely to apply to your roof, and how the neighbours handle it.

£564

Full plans, with VAT

£600

Building notice, VAT included

The figure most solid roofs will meet

Peterborough charges alterations by the estimated cost of the work. A tiled warm roof on a medium or large conservatory usually costs more than £10,000, which puts it in the band the council lists as Table C, category 13, "Estimated cost that exceeds £10,000 but does not exceed £20,000 (alterations)".

That band costs £470 plus VAT on full plans and £500 plus VAT as a building notice. The building notice route costs a little more. With no drawings examined up front, all of the checking happens on site while the roof is going up.

Only a building control officer can tell you which line your job falls under. The other lines below show where a smaller roof, or a differently described job, could land.

Every Peterborough line that could apply, ranked

These are the five charges in the council's schedule that come closest to a conservatory roof, ordered by the full plans charge with VAT. The longer bar is the building notice charge for the same line.

  1. "Estimated cost that exceeds £10,000 but does not exceed £20,000 (alterations)"

    Table C, category 13. The band most solid roof jobs on a medium or large conservatory are likely to fall into, judged by the cost of the work.

    Full plans£564
    Notice£600
  2. "Extension or annex with a floor area which does not exceed 10 square meter"

    Table A, category 1. Written for new floor area, so it is a comparison point rather than the usual route for a roof swap.

    Full plans£540
    Notice£594
  3. "Extension or annex comprising solely of a garage, carport, conservatory or covered way (up to 60 m²)"

    Table A, category 4. The only line in the schedule that names a conservatory. It is aimed at building one, not re-roofing one.

    Full plans£516
    Notice£540
  4. "Alterations, estimated cost £5,000 to £10,000"

    Where a smaller solid roof could land if the quoted work comes in under £10,000.

    Full plans£456
    Notice£480
  5. "Renovation of a thermal element"

    A thermal element is a wall, floor or roof that keeps heat in. This much smaller charge is for renovating one that already exists, so ask building control before assuming it covers a conservatory.

    Full plans£204
    Notice£240

All figures include VAT, as shown on the council's page beside the ex-VAT charge. Work estimated at over £20,000 is priced by quotation.

The same charges with and without VAT

If a firm quotes you the fee without VAT, this is the table to check it against. Category names are copied from the council's schedule where we have them word for word.

Category as publishedFull plansBuilding notice
Estimated cost that exceeds £10,000 but does not exceed £20,000 (alterations)
Table C, category 13
£470 + VAT (£564)£500 + VAT (£600)
Extension or annex with a floor area which does not exceed 10 square meter
Table A, category 1
£450 + VAT (£540)£495 + VAT (£594)
Extension or annex comprising solely of a garage, carport, conservatory or covered way (up to 60 m²)
Table A, category 4
£430 + VAT (£516)£450 + VAT (£540)
Alterations, estimated cost £5,000 to £10,000£380 + VAT (£456)£400 + VAT (£480)
Renovation of a thermal element£170 + VAT (£204)£200 + VAT (£240)

Source: Peterborough City Council, building regulations approval fees. Schedule valid from 6 May 2019; page updated 2 April 2026. Regularisation, for work already done without approval, carries no VAT.

The neighbours: quote on request only

Cross into Fenland or South Holland and there is no printed figure to compare. Both price building control job by job, so the only way to know is to ask.

South Holland District Council

No fixed figure published

Its page sends you to an online quotation or an email for the charge on a particular project. A charges document dated 1 April 2026 is linked, but we could not read figures from it, so none are shown here.

Their charges page

Fenland District Council (through CNC Building Control)

No fixed figure published

Fenland points applicants to CNC Building Control, which works out its charges through an online quote calculator rather than a printed list.

Their charges page

We also looked for Huntingdonshire, North Northamptonshire and South Kesteven, which border the district, but could not find or read a published schedule for them, so they are left out rather than guessed.

Where the money goes

The charge can feel like a tax on doing up your home. In practice it buys an independent check that the roof is sound and properly insulated, and a certificate you will want when the house is sold.

On full plans, the fee pays for the drawings to be examined up front (Peterborough has five weeks to rule on them, or two months if you allow it), for visits during the build and for the completion certificate. On a building notice, nothing is drawn in advance; two days after lodging it the job may begin, and every check is made on site while the roof takes shape.

You only meet this charge once the room loses its conservatory exemption, and in real life that means a solid, insulated roof. Our building regulations page explains why, and the cost page shows how the fee sits alongside the price of the roof itself.

A change on the way

From 6 November 2026, fresh regulations on building control charging in England oblige every council to put out a new scheme. Peterborough's schedule still dates from 2019, so it may be replaced. Check the council's page before you rely on these figures.

Method and sources

We read Peterborough City Council's published fee page and copied each figure exactly, including the VAT-inclusive amounts the council shows. We chose the lines that sit nearest to re-roofing an existing conservatory in tiles: the alterations bands by cost, the conservatory-only extension line, the small extension line and the renovation of a thermal element.

For neighbouring councils we read each council's own building control charges page. Where the page only offers a quote or a calculator, we say so and show no figure. Where we could not read a schedule at all, the council is named and left out.

Figures were compiled in November 2026. They are shown as published and are not a quote from any council.

Fee questions

Which Peterborough charge applies to a solid conservatory roof?

The council decides, based on the work described. Judged by cost, many tiled roofs fall in the alterations band for work over £10,000 and up to £20,000, which is £564 with VAT on full plans. Smaller jobs may land in the £5,000 to £10,000 band.

Do Fenland and South Holland publish a conservatory roof fee?

Not as a fixed figure we could read. South Holland asks you to request a quotation, and Fenland sends applicants to CNC Building Control, which prices work through an online quote calculator.

Is there a fee if I only replace the glass?

Normally not. Like-for-like glazing keeps the conservatory exempt in most cases, which means no application and so nothing to pay. The charge only arrives with a solid, insulated roof.

Compare prices with the council charge spelled out

Your postcode tells us which part of Peterborough or the villages you are in. The other three boxes are so the firm can ring or email you once you say yes.

You tell us where the conservatory is, we find one roof firm that covers that area, and we give you their name before a single detail of yours reaches them. You pay us nothing for this. How your request is handled

Where and who
Get a quote