The short answer

A new conservatory roof can change what your insurer thinks it is covering, so tell them before the work starts.

If the new roof is solid, keep the building control completion certificate: it is the proof the work was approved.

Ask the firm doing the work for its own insurance details too.

Insurance is rarely the first thing on anyone’s mind when they are choosing roof tiles. You are thinking about colour, light and whether the room will be warm by Christmas. But a conservatory roof replacement can change your house in ways your insurer cares about, and a short phone call before work starts can save a lot of argument later.

Why your insurer might care

Your buildings policy is priced on what the house is made of and how it is used. A conservatory with a light polycarbonate roof and a room with a solid, insulated, plastered roof are not the same thing. The second is closer to an extension, and it may cost more to rebuild if something goes wrong.

There is also the period while the work is happening. With the old roof off and the new one not yet weathertight, the house is more open to rain and to people than usual. Many policies have something to say about building work, so it is worth reading yours rather than assuming.

What to tell them, and when

The simplest rule is to ring before the work starts, not after. Most insurers will want to know a few things:

  • What is being done: a like-for-like sheet or glass swap, or a change to a solid tiled roof.
  • Who is doing it: the name of the firm and whether it carries its own insurance.
  • How long it will take: roughly when the roof will be off and when it will be closed up again.

Keep a note of who you spoke to and what they said. If the answer is that nothing changes, you have that on record too.

The paperwork that protects you

For a solid roof, the most important document is the completion certificate from building control. It shows the roof was inspected against the Building Regulations, including whether the frame and base could carry it. LABC notes that inspectors need to be satisfied the existing structure, frames and door supports and footings included, will cope with a heavier roof. If a crack ever appears, that is the very point an insurer or a buyer will raise.

Here is what is worth keeping in one folder:

Document Why it matters
Completion certificate Proof the solid roof was approved
The firm’s quote and invoice Shows what was fitted and when
Any guarantee from the firm Covers defects in the work itself
Notes of your call to the insurer Shows you told them in good time

Hang on to the folder for the day you sell, too: conveyancers tend to ask about any solid conservatory roof.

In Peterborough: who applies, and what it costs

Peterborough City Council runs its own building control service. For alterations costing £10,000 to £20,000, its fee page lists £564 with VAT on full plans or £600 as a building notice. Some roof firms make the application for you; others leave it with you. Either is fine, but make sure someone does it.

Full plans gives you an approval before work starts, which some people find reassuring when they are telling an insurer about the job. The Planning Portal explains the difference. There is more on the routes in our building regulations guide.

How it plays out in Stanground

Picture a three-bedroom house in Stanground with a large conservatory. The owners are swapping a leaking polycarbonate roof for a tiled warm roof, quoted at £13,000. Here is how it might play out:

  1. They ring their insurer before signing, explain the change and the dates, and note the reply.
  2. The roof firm submits a full plans application, which falls in the £10,000 to £20,000 alterations band.
  3. The work goes ahead, building control inspects, and the completion certificate arrives.
  4. The owners tell the insurer the work is finished and file the certificate with their deeds.

Nothing dramatic, and that is the point. Each step is small, and together they mean there is nothing for anyone to query later.

What if the roof was done before you moved in?

If you bought a house with a solid conservatory roof and there is no certificate, look through the papers from your purchase first. If it was never approved, councils offer a regularisation route for work already done; Peterborough lists it on the same fee page. It is better to find out now than when you sell.

Next steps for your roof

If you are still choosing between roof types, the cost calculator shows guide prices for each. And if you want a firm to look at the conservatory itself, the conservatory roof replacement peterborough homepage is where to begin.

Prices for your own roof, from a Peterborough firm

Your postcode tells us which part of Peterborough or the villages you are in. The other three boxes are so the firm can ring or email you once you say yes.

You tell us where the conservatory is, we find one roof firm that covers that area, and we give you their name before a single detail of yours reaches them. You pay us nothing for this. How your request is handled

Where and who
Get a quote